1.Truss deck introduction:
The steel truss deck is made by steel bars and steel sheets,which is also one kind of steel decks for high rise
buildings.Comparing to other steel decks,this type has the following advantages:
☆ It reduce factors that can make material costs increased:
Because it changes the usage of corrugated steel sheets,and as a template during the installation time,it reduce
the
dosage of steel sheets.At the same time,it reduce the anti-corrosion galvanizing layer requirements for profiled
steel
sheets.
☆ It changes the force mode of floor slab during the construction time:
It can offer greater strength,in order to accommodate larger unsupported slab spans.
☆ It reduce customer's maintenance cost.
The corrugated steel sheet is only used as a template for the construction stage.It doesn't need to be treated for
fire protection or meet requirements of the building life in the anti-corrosion,so there is no need to consider the cost
of post-maintenance.
2.Product specifications:
Product Composition |
Top rebars,Bottom rebars,Middle rebars,Bracket vertical rebars,Bottom mould |
Product parameters |
Top rebars & Bottom rebars:Hot-rolled coiled steel bar H R B 4 0 0E ,H P B 3 0 0 ; |
Middle rebars:Hot-rolled coiled steel rebar H R B 4 0 0 or Cold rolled round rebar with equivalent performance C R B 5 5 0 |
Bracket vertical rebars:Hot-rolled coiled steel bar H R B 4 0 0 ,H P B 3 0 0 ; |
Bottom sheets: Q 2 3 5 cold rolled steel sheet; S 2 5 0 G D + Z brand galvanized steel sheet.
Zinc coating is not less than 1 2 0 g / m² on both sides. |
Product specs |
Truss deck |
Specs |
Bottom sheet width(mm) |
576mm 600mm |
Length(m) |
1.0-11.9 |
Floor thickness(mm) |
100-300 |
Steel truss height(mm) |
70-270 |
Concrete cover thickness(mm) |
15(Top&Bottom of truss is 15mm) |
Bottom mould thickness |
0.50mm~0.80mm |
3.Deck truss product applications:
☆ High-rise, super high-rise building structure:
The high-rise and super high-rises not only have very strict requirements on the quality of the structure,but also have special
requirements for the construction period and site safety.To use truss deck floor slabs on high-rise buildings,it can form a plurality
of relatively independent
and safe working faces,and reducing the workload of on-site support and demolishing of stencils, and greatly improving the
construction progress.
☆ Long span steel structure:
The scientific and reasonable mechanical design enables steel truss floor decking to meet the 5M unsupported large span design requirements.During the actual construction process and before the concrete is poured,a simple temporary support can be set in
the slab span to meet the construction requirements.At the same time,it can ensure the slab strength requirements in using phase,
and speed up the construction progress and save costs.
☆ Irregular special shape structure:
For round,elliptical and other special-shaped steel structures,the steel deck are usually designed as two-way slabs.To use reinforced
steel bar truss deck can solve the support problem of floor construction in irregular shape structures well.
4.Deck truss selection table:
5.Deck truss VS. Corrugated steel deck:
Contrast point |
Deck truss VS. Corrugated steel deck |
Construction period |
Comparing to profiled steel deck,steel truss deck can reudce 60-70% steel bars banding quantities,and reduce construction period for each floor. |
Quality |
1,Steel truss deck is produced by computer numerical control equipment,steel bar distance is evenly arranged and even by force; 2,Concrete protection layers thickness and floor slab thickness can be effectively guaranteed; 3,Base mould is not involved in the use phase,so it doesn't need to consider fireproof and anticorrosive problem. |
Convenient and safe |
1,The base mold and steel rebars of deck truss are integrated in factory,which make it easy construction; 2,Deck truss can reduce the bundling of steel rebars.It not only saves labor costs, but also reduces the safety hazards of reinforcing steel bars on site; 3,The two-way stiffness of the floor slab is close, which is good for building earthquake resistance. |
Economic rationality |
1,The force mode of steel truss deck is reasonable, the material selection is economical, and the comprehensive cost advantage is obvious; 2,The height of the truss and the size of the steel bars of deck truss can be adjusted to accommodate large-span slabs; 3,Steel truss deck can be designed as a two-way board; 4,The bottom mold of truss deck is flat and beautiful, which increases the floor usage by 20%. |
Cost reducing |
1,Steel truss deck can reduce the labor consumption; 2,Deck truss can reduce the cost of rented construction machines and construction management cost; 3,Deck truss can shorten the installation time,thereby speeding up the capital turnover, which reduces the cost. |
FQA
Q1. Are you a factory or a trading company?
We are professional factory with ISO,CE standard,OEM service is welcome.
Q2. What's your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance.
Normally,delivery time is 5-15 days after receive deposit. Large order delivery time should be arranged separately.
Q3. How to control the quality of your product?
a) Quality of the design: think about possible problems in advance and provide a high quality design solution.
b) Quality of the raw material: choose the qualified raw material
c) Quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
Q4.what is the length can you offer?
20'GP or 40'HQ. So in order to take good advantage of container space,
we suggest the length no more than 11.8 M.
Q5.How long time your paint will last?
The durable time will be different in different zinc, paint coating. Also different environment has
different effect on the durable time.
Q6.What is PE coating?
PE is most widely-used painting in the color coated steel coils. It is characterized
by good overall performance, and high economic as well.
Q7: Can you provide us with design services?
A: Yes, we can design a complete solution drawing according to your requirements.
We will be glad to establish sincere business cooperation with you in the near future.
Q8: Do you provide guidance services for overseas site installation?
A: Yes. . We will provide detailed installation drawings and videos free of charge.
Q9: How can I get your quick quotation for my project?
A: The more detailed your description, the faster our quotation will be. You can chat with us by
email or telephone at any time and provide us with your detailed information, or you can leave
a message on our website. We will provide you with the best quotation as soon as possible.
Thank you for your cooperation.
Q10: What is the trading procedure?
Answer: Design drawings → Confirm drawings → Quotation →PI→ Confirm PI→ Arrange 30%
deposit → Manufacture →QC inspection → Pay the balance → Freight. Q5: What is the biggest
advantage of your product? A: The quality of our products is superior to that of other manufacturers.
We use high-quality raw materials and strictly control the quality of production. We improve the
product performance by improving the technology. These make our products more beautiful,
longer in service life and lower in use cost.