1,Steel deck overview:
Floor decking sheets is also known as profiled steel deck,metal deck,roof decking, etc.The earliest name of bondek is called corrugated steel deck,and all steel floor decking sheets that are pressed and formed by a platen press and are collectively referred to.The floor slab is made from galvanized steel sheet by cold roll forming,and its cross section is V-shaped, U-shaped, trapezoidal or the like. It is mainly used as a permanent template and can also be selected for other purposes.The earliest compacted steel decking sheets were mainly used as roof panels of factory roof,followed by profiled steel plates used for the floors and gradually classified as floor decking sheets.YX51-250-750 is one kind of typical Composite floor deck,here we will introduce more about this model.
2,Product specification&Sectional properties:
Thickness (mm) |
Weight (KG/M²) |
I(cm4/m) |
I(cm3/m) |
0.75 |
8.37 |
47.67 |
23.19 |
1.00 |
10.47 |
59.56 |
28.59 |
1.20 |
12.56 |
71.44 |
34.51 |
3, Roof deck material standards:
The material of floor decking sheets is hot-dipped zinc-coated (galvanized) structural steel sheet with a spangled surface.Here we offer one standard list for your reference.For zinc coating,we could make from 120 g/m² to 450 g/m².
Steel standards |
Yield Strength(MPa) |
Tensile strength (N/mm²) |
Q235 |
≥235 |
215 |
Q345 |
≥345 |
300 |
G500 |
≥500 |
520 |
G550 |
≥550 |
550 |
4,Application of Deck system:
Steel decking system is popularly used in all multi-rise buildings,like financial center,office high rise building,exhibition hall,theaters,etc.
5,Application of Deck system:
6,Features of composite decks :
1, Opened type floor decking sheets can meet the requirements of rapid construction of the main steel structure, and can provide a firm working platform in a short time. The pressure type steel plate can be laid on the multi-layer floor, and the concrete slab can be poured by layering;
2,In the using stage, the floor is used as the tensile rib of the concrete floor, which also increases the rigidity of the floor and saves the amount of steel and concrete;
3,The decking sheets pressing mode maximizes the bonding force between the bottom plate and the concrete, and makes the two form a whole, reinforcing ribs, so that the bearing plate system has a high bearing capacity;
4,Under cantilever conditions, the floor is only used as a permanent template. The length of the cantilever can be determined according to the cross-sectional characteristics of the floor. In order to prevent the cantilever plate from cracking, the negative reinforcement should be installed at the support point according to the design of the structural engineer.
7,Span tables for reference:
|
|
|
|
Deflection Limited = L/130 |
Span type |
Composite weight(kg/m²) |
Single spans(mm) |
Two spans(mm) |
Three spans(mm) |
Slab THK(mm) |
Bondek THK(mm) |
100 |
0.75 |
179.86 |
2140 |
2400 |
2470 |
1.00 |
183.58 |
2260 |
2560 |
2630 |
1.20 |
184.30 |
2330 |
2730 |
2740 |
110 |
0.75 |
198.74 |
2100 |
2350 |
2440 |
1.00 |
201.74 |
2200 |
2520 |
2570 |
1.20 |
203.65 |
2290 |
2680 |
2690 |
120 |
0.75 |
219.60 |
2040 |
2310 |
2400 |
1.00 |
221.69 |
2150 |
2470 |
2530 |
1.20 |
223.79 |
2240 |
2630 |
2640 |
130 |
0.75 |
244.60 |
1980 |
2260 |
2330 |
1.00 |
246.69 |
2090 |
2420 |
2460 |
1.20 |
248.79 |
2180 |
2580 |
2570 |
140 |
0.75 |
269.60 |
1930 |
2220 |
2280 |
1.00 |
271.69 |
2040 |
2380 |
2400 |
1.20 |
273.79 |
2130 |
2530 |
2510 |
150 |
0.75 |
294.60 |
1890 |
2180 |
2230 |
1.00 |
296.69 |
2000 |
2340 |
2350 |
1.20 |
298.79 |
2090 |
2480 |
2460 |
Note:This data is for model YX51-250-750 and based on Chinese steel standards Q345.If you have any other steel standards span data needed,please contact us,thank you.
8,Bondek loading VS. Concrete strength grade:
Strength grade of concrete |
Floor height(mm) |
Thickness of Bondek(mm) |
Mr(KNm) |
Strength grade of concrete |
Floor height(mm) |
Thickness of Bondek(mm) |
Mr(KNm) |
C25 |
100 |
0.75 |
22.35 |
C30 |
100 |
0.75 |
23.07 |
1.00 |
26.61 |
1.00 |
27.73 |
1.20 |
30.34 |
1.20 |
31.95 |
110 |
0.75 |
25.12 |
110 |
0.75 |
25.92 |
1.00 |
29.90 |
1.00 |
31.16 |
1.20 |
34.09 |
1.20 |
35.89 |
120 |
0.75 |
28.22 |
120 |
0.75 |
29.12 |
1.00 |
33.60 |
1.00 |
35.01 |
1.20 |
38.30 |
1.20 |
40.33 |
130 |
0.75 |
31.42 |
130 |
0.75 |
32.32 |
1.00 |
37.60 |
1.00 |
39.01 |
1.20 |
43.10 |
1.20 |
45.13 |
140 |
0.75 |
34.62 |
140 |
0.75 |
35.52 |
1.00 |
41.30 |
1.00 |
43.01 |
1.20 |
47.90 |
1.20 |
49.93 |
150 |
0.75 |
37.82 |
150 |
0.75 |
38.72 |
1.00 |
45.60 |
1.00 |
47.04 |
1.20 |
52.70 |
1.20 |
54.73 |
Note:This data is for model YX51-250-750 and based on Chinese steel standards Q345.If you have any other steel standards data needed,please contact us,thank you.
9,Installation notes:
1.Before installation,ask for floor decking sheet to be completed and delivered in order,according to project plan.All the bondeck sheets need to be transported in batches to the site,and arranged in order,suspended at the bottom and placed on the main beam. Blocks are laid and used manually from near to far to ensure continuous straight and overlapping engagement.
2,After quality inspection, when the main beam of this layer is installed correctly, it can be hoisted into the floor.The command is to hang the corrugated steel deck to the designated location,and lay the decking sheets,and install the outer sealing plate,finally weld the floor decking.
3. Before laying concrete metal decking ,the dirt on the top of the secondary beam must be cleaned to prevent moisture or water accumulation to ensure the quality of the stud welding in the next process.
4. When laying the floor slab, it should start from the starting line of the construction drawing and move along the installation position of the board to ensure the horizontal and vertical slabs after laying.
5,Please use the female ribs as the starting edge,and layout according to the layout diagram.The floor decking sheets is used from one end to the other, and the last piece is used as an adjustment plate because the width of the beam is different, but the sides need to be welded flat on the beam. If there is a difference value, the width of the circle is adjusted.
9,Other models:
9,Packing & Loading:
Nomal packing:
All our metal decks will be packed well with steel strip and PVC flims to protect the decking sheets.
Other packing:
Or you could choose to pack with Kraft paper or steel sheets.Please indicate,when inquiry.
When you have special requirement,you could also require us to make steel shelf to pack and suppor the goods,like following pic showing:
10,Fire test report:
11,Service & Support:
Xiamen Yumi Imp. &Exp. Co., Ltd. Is one combination of industry and trade company, and very professional with steel structure products in China. Because of good quality and service, competitive price, our products are sold worldwide, such as America, South America, Europe, Southeast Asia, Africa etc.
1)Professional sales team,One-to-one service;
2)Combination of industry and trade company,to ensure the service and price;
3)Experienced engineer team to offer professional technology service;
4)Intimate after-sales service.
Experienced technology suport, competitive price, professional service, we are here to help you go on with your project smoothly.